The wage floor of a service or construction bid, by county and occupation
A service contract covered by the Service Contract Act must pay each occupation at least the wage and the fringe its wage determination sets for the county where the work is done, and a construction contract must pay the Davis-Bacon rates. A price built under that floor is a price you cannot perform at. Wage determinations keeps the Department of Labor determinations as SAM.gov publishes them, with the rates read into a table.
By county, construction type and group code
The Wage determinations screen is under Proposal in the menu, beside the price volume. Pick a state and a county, and service or construction; for construction, the type of work too: building, heavy, highway or residential. The determinations in force there are listed, each at its newest revision, the most recently changed first.
Open one and each occupation is a row with its code, its title and its hourly rate, with the health and welfare fringe, the vacation and holiday terms, and the full text of the determination in a fold below. Every determination links to its own page on SAM.gov.
- One occupation looked up across a state or in one county
- A construction classification found by its name or by the group code above its rates, such as ELEC0098-001
- Davis-Bacon classifications with their rate and fringe where the text gives both
a missing requirement costs the bid; an awkward one costs nothing
Opened from a pursuit, or from an occupation
Press Wage floors on a pursuit in the pipeline and the screen opens on the state where the pursuit's work is done, and says so. Pick another state at any time.
On Occupational wages, each occupation lists the Service Contract Act occupations whose titles match it, and each opens the determinations that name it, in the state where your company is or where your pursuit's work is done. What the work is paid in the market and the least a covered contract must pay it are one press apart.
On Timesheets, under Contracts, set the wage floor of each labor category on a covered contract, and Reports reads every hour worked against it.
- The state of the pursuit's work, picked for you
- The Service Contract Act match of every occupation
- Wage floors kept on Timesheets and read hour by hour
1,840 awarded rates from 212 companies
Read the rate in your price against the floor
Your price volume carries a rate for every labor category. Where the work is covered, each of those must be at or above the wage determination for the occupation it maps to, plus the fringe. A rate under the floor is a cost you have to carry for the life of the contract, and an evaluator who knows the determination will see it.
Read the price volume beside the determination for the place of performance, and beside what the same job is paid in that market, before the number goes out.
- The floor, from the determination
- The market, from occupational wages
- The ceiling, from the GSA labor rates
the box is the middle half of 214 awards 42% of them drew a single offer log scale, because contract money is
How a determination is read
A Service Contract Act determination lists each occupation by a five-digit code, its title and an hourly rate, and states the fringe in its text: health and welfare by the hour, and the vacation and holidays an employee is owed. Those are read into the table, with any footnote mark kept. A Davis-Bacon determination lists classifications with a rate and a fringe, often in groups, and each is read where a line clearly gives both.
The whole text is always shown beside the table, because the text is what binds and a table read from it is a convenience. A determination based on a collective bargaining agreement is kept as text.
Wage determinations, as SAM.gov publishes them
About 5,600 determinations in force are on file, about 1,500 for service contracts and about 4,100 for construction. About 509,000 occupation rates were read from them. The figure is rounded down.
Where it stops
Wage determinations comes with every paid plan. The determination in your solicitation, by its number and revision, is the one that binds you: check it against the one here. The rates are read from the text and the text is shown beside them. Nothing here is legal advice about whether the Service Contract Act or Davis-Bacon covers your contract.
Related
- Bid worksheetThe price volume the floor applies to.
- Occupational wagesWhat the same job is paid in the market, with its Service Contract Act match.
- Labor ratesThe ceiling rates awarded on the GSA schedules.
- Pipeline and calendarThe pursuits whose wage floors open from their row.
- The platformWhere this sits among the eight parts of the product.
See who was last awarded in your NAICS
Every code, every buying office, every vendor and every recompete, organized from the federal record and read nightly. Start on one code with no card. A plan opens every code.
Try the live demo The real app on one code. No email needed.